Twelve weeks.
Not twelve months.

Hover over each stage to see moreTap each stage to see more

The difference
Your home is finished and certified before a traditional build has even broken ground.
The journey

Four steps
to your keys.

Custom sizes follow the same four steps.

01

Choose and lock it in.

Pick your design and pay your deposit. Your build is confirmed and locked into the schedule.

02

Approved, then straight into production.

Once approval is granted, your home goes into production. From here the build and your on-site works run in parallel, not one after the other.

03

Built on your block.

Precision-engineered components, built on your foundation by a licensed builder - with your services and rough-in already in the slab.

04

Completed. Keys in hand.

Final connections, inspection and occupation certificate. Move in - or list it and start earning in about twelve weeks.

What happens on your block.

Set out, services in the base, the pour - then a finished home. The ground work is the same on every build.

Set out. Services. The pour. Then a finished home.

A cleared block in Concord, fenced and marked out, before any work starts
ConcordA cleared block, set out.
Reinforcing mesh over a membrane with plumbing risers standing ready for the pour
ConcordSteel and services, before the pour.
A concrete pour underway, pump hose in hand and the crew screeding the wet slab
ConcordThe pour, on the day.
A finished two-bedroom secondary dwelling in an Eastwood backyard
EastwoodFinished, and handed over.

Separate jobs, one team: the homes shown are recent builds by D&L Golden Construction, the family building company behind Rivela.

Your site works and your home,
built at once.

Drag to compare

While the crew prepares your foundation and services on your block, your home is already in production. The two run together, which is where the weeks go.

Your home in production, at the same time as your site works
Foundation and site works underway on your block
Same week · your foundation goes inYour block
Same week · your home is in productionYour home
What you don't deal with

No site chaos.

Built indoors, approval handled for you, the price clear from the start.

Signed approval documents, plans and keys on a desk
01

Approval off your plate

Managed end to end - you never chase council or a certifier.

A tidy, finished backyard deck and garden
02

No six-month mess

Fewer trade handovers. Your backyard is a site for days, not months.

Door handle and keys on a finished Rivela home
03

No surprise invoices

A clear starting price for the home, with your approval costs and any site variables quoted upfront in writing.

A clear starting price. Approval costs and site variables quoted upfront, in writing.